Summary - I<BR>Timing X Rate interaction for both (yield loss) <BR> <BR>Engenia <BR>Within Time <BR>1X > 0.1X > 0.01X  (15, 30, 60 DAP) <BR>1X > 0.1X = 0.01X (90 DAP) <BR>Within Rate <BR>15 DAP = 30 DAP  = 60 DAP > 90 DAP (1X and 0.1X) <BR> = 8% yield loss at any timing (0.01X) <BR>