Change in Valor Label? <BR>Strip-Till Production:  Apply Valor at least 7 d ahead of planting as long as the strip operation occurs between applying Valor and planting. <BR> <BR>No Till Production: <BR>1.  <30% residue:  28 days and 1 inch rain <BR>2.  >30% residue:  21 days and 1 inch rain<BR>